Inside the Concord West production warehouse: steel roof trusses and open floor

Featured case · Film production site · Temporary network

Online before
the crew moved in

Concord West film production site network: one-stop support from urgent enquiry to on-site delivery

Location
Concord West, Sydney
Client
Film production team
Site
Warehouse · offices · upstairs meeting room
Expected use
About 60 people · mostly on WiFi
Internet plan
2000 / 500 Mbps
Pace
Installed on day 4 after enquiry
ONE TEAMThe client confirmed needs, approved the quote and supplied key documents — one team handled everything from the internet service to on-site delivery.
01
The Brief
Project background

The crew was about to move in, and needed a working network fast.

The client was renting an industrial site in Concord West for a film production and needed a network for a team of about 60 — for on-site office work, production coordination and everyday connectivity. They wanted it ready before the site opened, leaving about a week from first enquiry to move-in.

As a short-term site, the plan had to balance fast installation, coverage of priority areas, later set-build changes, and easy removal of equipment at the end of the project.

  • Priority areasUpstairs meeting room and offices, while also covering the ground-floor warehouse.
  • ScaleAbout 60 people expected, connecting mainly over WiFi.
  • DurationAn initial period of about three months.
  • What the client wantedA network ready before staff arrived, coordinated by one provider, with as little of their time as possible.
Exterior of the temporary production site building
The temporary production site
From first enquiry to move-in day,
there was about a week.
02
The Challenge
Time, space and existing services

The client gave us their basic requirements and the leasing agent's contact, then a floor plan. From there, Sydney IT Fix led the broadband checks, site survey, access coordination, equipment purchasing, provider liaison and installation. The agent had limited information about the existing services, so much of it had to be verified on site.

01A tight deadlineSurvey, quote, provider application, purchasing, configuration, installation and testing all had to fit into a short window, alongside site access.
02Clear priority areasThe site combines a warehouse with upstairs offices, and the client named the upstairs meeting room as the priority.
03Power limits placementNot every ideal spot had a power point, so placement balanced power, existing cabling, space and coverage goals.
04A layout still in fluxStaff hadn't moved in, and desks and sets weren't final, so the design had to leave room for adjustment.
05Incomplete service detailsAn internet service already existed, but the account holder and arrangements were unclear, so the new service had to be progressed with limited information.
06Other users at the addressWe needed to coordinate the existing network and the connection needs of others on site.
The warehouse floor during the site survey
Ground-floor warehouse
03
The Approach
Chosen for the real site
Arrive prepared

Questions listed before the survey

Using the client's floor plan and early conversations, we prepared a site checklist, key questions and initial placement ideas. The survey focused on headcount, priority work areas, existing broadband equipment, power points, available cabling and likely changes to the site — the basis for our proposal and quote.

A node placed by the warehouse wall near an existing power point
Placement planned around existing power
Provider chosen for speed

The fastest route to the same plan

After confirming the site's NBN equipment supported the target plan, we used the client's lease as proof of address. Weighing each provider's document requirements, checks and processing times, we chose the one that could activate the same tier fastest, and the 2000/500 Mbps service was activated.

2000/500Plan tier — not the measured speed at every location
Phone speed test screenshot on installation day
Phone speed test on installation day
New equipment · professional selection

Tri-band WiFi 7 mesh, supplied on rental

We used brand-new TP-Link Deco tri-band WiFi 7 mesh units with a combined retail price of about A$2,300, supplied to the client on rental. The selection took into account:

  • About 60 expected users, mostly on wireless
  • Coverage priority for the upstairs meeting room and offices
  • The warehouse space, available power and cabling
  • A tight installation window and short-term rental
  • Easy adjustment later, and easy collection at the end

The units support the 6 GHz band, adding an extra band for a film set that may be busy with 2.4 GHz and 5 GHz devices. Real-world results are judged through on-site deployment and testing.

A mesh node in the upstairs office area
Upstairs office node
Wired + wireless, as the site allows

Upstairs and down, built around the site

Depending on the environment and cable routes, some mesh nodes were connected by cable and the rest wirelessly. Placement balanced power, priority areas and test results, and left room to adjust once staff moved in.

Mesh app view of the nodes across both floors
Node topology in the mesh app
Handling the unexpected

Looking after others at the same address

After the new service went live, we found another user at the same address relied on the original connection. We explained the situation in person and connected their existing router through the existing cabling, restoring their internet. Both sides keep their own WiFi and share the broadband connection.

04
The Delivery
Every stage documented

Every key stage has an email record and filed documents.

StageWork and deliverablesValue to the client
PreparationFloor plan review, site checklist, initial design thinkingIssues identified early; faster conversations
Site surveyPriority areas, broadband equipment, power and cabling verifiedA plan based on the real site
Proposal & quoteFormal quote and explanatory email sent the evening of the surveyScope, cost and next steps clear without delay
Activation & purchasingProvider application followed up, new equipment purchased, progress sharedLess time coordinating multiple suppliers
InstallationAccess coordinated; devices configured, placed and networkedOne team driving delivery
Testing & reportCoverage checked, speed tested, photos and test report prepared the same dayEasy to review, forward internally and file
Ongoing serviceAgreement signed, covering support scope, rental term and removalA clear basis for ongoing use and maintenance
  1. Day 1Urgent enquiryThe client needs the network ready before the site opens.
  2. Day 2Survey + quoteOn-site survey; formal quote sent that evening and accepted by email.
  3. Day 3Activation + purchasingInternet plan activated; new equipment purchased.
  4. Day 4Install + reportInitial installation, configuration and coverage testing; test report delivered the same day.
  5. AfterAgreement + supportService agreement signed; network support provided as agreed.
Cover of the installation and test report delivered on the day (client details removed)
Report page showing equipment positions and site photos
Installation report delivered on the day (client details removed)
05
The Value
What this case shows
Professional judgementEquipment and deployment chosen for the real needs, power, existing services and timeline — then checked by testing.
Less of your timeWith requirements, the agent's contact and proof of address, we drove the technical work and delivery.
Fast responseEnquiry, survey, same-evening quote, activation, purchasing and installation, back to back.
Clear handoverEmails and documents at every key stage, with a test report delivered on installation day.
Ongoing supportEquipment rental and agreed maintenance matched to a short production schedule, through to removal.
Delivery result
The client had a working network before the planned move-in date.

After installation we checked WiFi in the upstairs offices and in the corners and centre of the ground-floor warehouse; the test device showed full signal at every location checked. Before leaving, we removed all packaging and rubbish, locked the warehouse entrance and returned the key to its usual place.

RESULT

From brief to delivery — so the team can focus on production.